99ri日韩精品视频|久久成人永久免费播放|国产色综合色产在线视频|久久婷婷香蕉热狠狠综合|免费h无码动漫在线观看人|欧美日韩国产在线人成网站|九二精品福利少妇午夜一百集|99国产精品丝袜久久久久无码

當(dāng)前位置: 首頁 > 資料下載 > 工業(yè)控制 > PLC

施耐德-Medium power busbar trunking Canalis KS(100 to 800A) Catalogue

PDF文檔
  • 文件類型:PDF文檔
  • 文件大。2.53M
  • 更新日期:2016-02-26 15:54
  • 瀏覽次數(shù):418   下載次數(shù):509
進(jìn)入下載 PDF預(yù)覽
詳細(xì)介紹
 施耐德-Medium power busbar trunking Canalis KS(100 to 800A) Catalogue
Components for changing direction
1、Edgewise elbow.
One model for each size of
casing for turning to left or right.
2、Flatwise tee
Two models for each size of
casing (one ascending, one
descending).
3、Edgewise tee
For vertical branches on the
main run.
二、Fixing devices
1、Universal brackets
These brackets are used to fix the distribution
run to the structure of the building, directly or via
a threaded rod, a bracket, etc.
There is one model for each size of casing which
can be used for all mounting methods : ceiling
mounted, suspended, wall mounted, etc.
Suspension on chains or steel cables is not rec-
ommended.
It is advisable to leave a space of 3 m between
each bracket.
2、Spring brackets
These brackets are fixed on floor ground to sup-
port distribution run in vertical application, used
in rising building such as rising apartment, com-
mercial skyscraper, etc. For all ratings from 100
to 800A, there’s only one model and must be
used in couple.
The spring brackets can absorb the vertical
construction expansion and adjust the busbar
situation, so as to distributing equally and
averagely on all floors.
 
[ 資料下載搜索 ]  [ 加入收藏 ]  [ 告訴好友 ]  [ 打印本文 ]  [ 關(guān)閉窗口 ]

下載地址
 
推薦資料下載
本類下載排行
總下載排行
 
首頁 | 店鋪 | 產(chǎn)品中心 | 工博士培訓(xùn) | 資料下載 | 方案案例 | 機(jī)器人選型 | 會(huì)員注冊(cè) | 關(guān)于我們 | 聲明 | 合作客戶 | 聯(lián)系方式 | 網(wǎng)站留言| 網(wǎng)站地圖

咨詢電話

021-80392549

企業(yè)微信